Starting on October 29, 2026 at 5:06 am UTC, Automation Ops pages in the cloud portal failed to load for customers across most production environments. Affected page requests returned 403 Forbidden (access denied) errors when loading required web assets. The issue was resolved later that morning after the underlying change was reverted.
Backend Automation Ops processing, including scheduled jobs, was not affected.
A firewall change applied to a non-production storage location blocked access to static web assets that production Automation Ops pages depended on through a shared content delivery path. Because those asset requests were denied with 403 Forbidden responses, the affected Automation Ops pages could not finish loading.
This occurred because the production environment had not yet been migrated to its own dedicated storage and content delivery infrastructure — it was still sharing a resource hosted in a non-production environment. This pre-existing architectural gap made production vulnerable to any security change applied to the non-production storage location.
The issue was identified when Automation Ops pages began failing to load in production and was confirmed through automated monitoring. The firewall change that triggered the failure occurred at 5:06 am UTC on October 29, 2026.
After confirming that affected Automation Ops pages were still requesting assets through the non-production content delivery path, our engineering team evaluated two mitigation options: complete the production migration, or temporarily restore access to the existing asset path.
The team chose to revert the firewall setting to restore access while the production migration continued. Automated monitoring confirmed that checks were passing shortly after the revert, and portal validation confirmed full recovery. Deployment validation then continued across the remaining production environments before the incident was closed.